A bold contemporary bathroom renovation in Wandsworth – Shower Room 2

Behind the Renovation: Rebuilding a Shower Room from the Inside Out

At Sturgeon Renovations, we love the whole lifecycle of a project — not just the finished room.

This shower room started as an existing fitted space ready for a complete rethink. Since then, it has been stripped back, rebuilt from the inside out and is now reaching the stage where the finished design is beginning to emerge.

And that journey is something we think is worth showing.

Where we started

The original shower room included fitted cabinetry, a countertop basin, WC and older wall and floor finishes.

Before creating the new room, the existing fittings and finishes needed to come out so that the underlying structure and services could be properly accessed.

It is not the glamorous part of a renovation — but it is where a successful project really begins.

Stripping the room back

Once the existing bathroom was removed, the walls and floor could be opened up and the construction behind the finished surfaces exposed.

This gave the team access to the plumbing, existing structure and services, allowing the room to be prepared properly rather than simply replacing what could be seen on the surface.

Building from the inside out

With the room stripped back, work could begin on the new structure.

Timber framing, insulation, wall preparation and new boarding have all formed part of rebuilding the space.

A new concealed WC system has also been installed, allowing much of the functional equipment to eventually disappear neatly behind the finished surfaces.

This is the stage of a renovation that clients rarely see once everything is complete — but much of the work that determines the quality of the finished room happens here.

Preparing the new shower room

The walls were carefully boarded and prepared to create a suitable foundation for the new finishes.

Services were positioned in advance for the new bathroom fittings, while the structure of the room began to reveal the eventual layout.

Again, much of this work will ultimately disappear from view.

That’s rather the point.

Good preparation should allow the finished room to look effortless.

Now the design starts to appear

And this is where things become particularly satisfying.

The latest stage sees the installation of slim green glazed tiles, laid vertically across the walls.

Individual tiles are being carefully positioned and spaced as the finish progresses around the room.

A recessed wall niche has also been incorporated into the tiled wall, creating useful storage while keeping the overall finish clean and integrated.

With the green tiling extending around the shower area, the transformation from the original room is suddenly much easier to see.

There is still work to do — the photographs deliberately show the room mid-build — but the character of the new space is now beginning to emerge.

The finished project gets the glory. We love the work that gets it there.

Finished photographs are important, of course.

But at Sturgeon Renovations, we think the stages before them are worth showing too.

The framing.
The plumbing.
The preparation.
The careful setting out.
The tile spacers.
The unfinished ceiling.

These are all part of the renovation.

They show how a room moves from an idea, through construction and craftsmanship, towards the finished result.

This one isn’t finished yet.

But it’s getting rather exciting.

We can’t wait to show you what comes next.